Firefighting System Installation for Bonded Warehouse at Thang Long Logistics Co., Ltd

Firefighting System Installation for Bonded Warehouse at Thang Long Logistics Co., Ltd

. Project Overview of Fire Protection System at ...

In the context of the global supply chain demanding increasingly strict warehousing safety standards, establishing an international-standard fire fighting protection system is a prerequisite for logistics enterprises. The construction of the fire fighting system at Thang Long Logistics Company Limited is one of the key projects, affirming the investor's strategic vision in protecting corporate assets, human lives, and maintaining continuous operational workflow without disruption. The project is comprehensively deployed in the general warehouse area and specifically in the bonded warehouse zone - where import and export goods are stored under strict fire risk control requirements.

This fire fighting protection system construction item is not merely the installation of basic mechanical equipment, but an integrated engineering solution including core water intake-storage infrastructure, high-pressure distribution pipe networks, seismically reinforced pipe support systems, and intelligent automatic fire alarm and suppression systems. Under the close coordination and technical supervision of Chief Engineer Pham Quoc Duy, the project management team along with highly specialized personnel have been realizing the most stringent standards of the current Vietnamese Standards (TCVN) on fire safety.

2. Detailed Construction Diary on June 08, 2026, and Engineering Methodologies

The progress report on June 08, 2026, recorded a large volume of work completed synchronously across two core fronts: foundational infrastructure construction and specialized mechanical-electrical fire protection. Seamless coordination between teams optimized time and ensured absolute safety on site.

Task CV1: Earth excavation for the backup fire fighting water reservoir The backup fire protection water reservoir is the heart of the entire fire fighting system when an incident occurs. Executing the excavation of the water reservoir requires extreme precision regarding technical elevations and trench shoring measures. On June 08, 2026, the construction team in coordination with high-capacity excavator drivers carried out topsoil stripping and excavated deep according to the approved design elevation. The construction methodology was carefully calculated to prevent acute landslides, especially in the context of potentially adverse weather conditions. The entire volume of excavated soil was classified on-site for backfilling or immediate transport off-site.

Task CV2: Installation of pipelines and support systems inside the bonded warehouse The bonded warehouse is an area with a high density of cargo storage, where the overhead space is typically reserved for industrial racking systems. Therefore, installing pipelines and support systems requires precise geometric space calculations to avoid conflicts with other MEP items and the structural framework of the warehouse. The fire protection technicians proceeded with positioning, anchoring high-strength expansion bolts into concrete beams, and installing specialized anti-vibration hangers and brackets. The main fire fighting pipeline was hoisted using specialized lifting equipment and then firmly secured to the support system, ensuring high-pressure resistance when high-velocity water flows through.

Task CV3: Fabrication of fire protection pipes at the auxiliary workshop To ensure a continuous installation pace at the field, fire protection pipe fabrication was performed simultaneously at the site's auxiliary workshop area. This process includes the following steps: cutting pipes according to shop drawing dimensions, beveling, welding pre-assemblies, grooving for pipes connected by quick couplings, and anti-rust paint coating. Fabricating at the workshop helps control weld quality and technical detail uniformity before actual high-level installation inside the bonded warehouse, minimizing errors and wasted time at height.

Task CV4: Environmental sanitation, transport of construction debris and surplus soil A professional construction site is a clean and safe site. Simultaneous with the reservoir excavation progress, the supervision board mobilized the construction team combined with 2 specialized dump trucks to collect and transport the entire volume of surplus soil, construction debris, and construction waste out of the project premises. This activity ensures that the construction site remains clear, creating favorable conditions for other mechanical vehicles to maneuver, while strictly meeting the occupational health, safety, and environmental protection standards of Thang Long Logistics Company Limited.

3. Human Resource Structure, Mechanical Equipment, and Site Coordination Capability

The success of the working day on June 08, 2026, was based on a scientific personnel organization chart and a synchronous system of mechanical equipment. The site command board deployed an elite force to optimize each production stage through detailed rosters. Effectively supporting the human resources is a modern system of tools and mechanical equipment including: crawler excavators with high loading capacity; disc cutters, specialized reinforced concrete core drills for anchoring support bolts; and heavy-duty dump trucks. All mechanical vehicles and handheld equipment underwent strict safety inspections before operation, ensuring no technical breakdowns interrupted the overall schedule.

4. Importance of TCVN-Compliant Fire Systems for Bonded Logistics Warehouses

The fire protection system in a bonded warehouse not only plays a role in protecting assets but is also an inseparable part of customs clearance procedures and international cargo insurance. The items stored in the bonded warehouse of Thang Long Logistics Company Limited are highly diverse, possess high economic value, and follow strict management guidelines. If a fire incident occurs, the damage does not stop at the material value of the goods but severely affects the credibility of the global supply chain and the delivery schedules of import-export partners.

Investing methodically in pressure-resistant pipe execution methods, flexible grooved joints combined with anti-seismic support systems ensures that the fire protection system has a long lifespan and operates stably under all harsh conditions. The large-capacity backup water reservoir guarantees a continuous water supply for the automatic sprinkler system and indoor fire hydrants for an extended period before the intervention of professional fire fighting forces. This serves as the solid shield, bringing absolute peace of mind to clients storing goods at Thăng Long Logistics.

5. Commitment to Schedule, Quality, and Project Handover Objectives

With the expected handover milestone on August 25, 2026, the remaining time is not too long but entirely within the control of the site command board under the management of Supervisor Pham Quoc Duy. Medium-term progress milestones have been established in detail weekly and monthly to control delay risks. Upon completing the water reservoir excavation and the installation of raw pipes and supports in the bonded warehouse, the project will transition to the phase of central equipment connection, pipeline hydrostatic pressure testing, and single-action as well as integrated system commissioning.

We commit that every single detail, from the spacing of pipe supports and the quality of fire pipe welds to the reinforced concrete structure of the water reservoir, precisely complies with the approved design drawings and fire protection regulatory approvals. The hard work of the collective staff and workers at the Thang Long Logistics construction site is the clearest proof of our prestige, execution capacity, and highest responsibility toward project quality.

CHUAN'A CONSTRUCTION INVESTMENT JOINT STOCK COMPANY

  • Hotline: 0907 494 549 
  • Website: chuana.com.vn
  • Email: info@chuana.com.vn
  • Facebook: Chuẩn A Corporation 
  • YouTube: @chuanaconstruction 
  • TikTok: @chuanaconstruction 
Xem thêm
  • Chia sẻ qua viber bài: Firefighting System Installation for Bonded Warehouse at Thang Long Logistics Co., Ltd
  • Chia sẻ qua reddit bài:Firefighting System Installation for Bonded Warehouse at Thang Long Logistics Co., Ltd

News

Loading...

Service Catalog

Loading...

Thư viện ảnh

Loading...

Related Services

Loading...
Loading...
CHUAN A CONSTRUCTION INVESTMENT JOINT STOCK COMPANY